1: Crim Progress: Finished the C# code to operate the Siglent DMM.  Using it to calibrate the OSCIloscope readings.   Will have a video next weekend showing where we are.  Hope to be driving the ramp circuit by then.

2)Rowland: Forgot the post the Excel Spread sheet from the Rowland -- be posting after this.

3) GalaxySimulator: Having problems installing the packages on Raspberry PI.  Trying to install XRDP and GEANY -- nothing works -- corrupted the desktop, had to start over, Installed a newer version of Raspin -- hope that works.  If that does not work, will switch to a 4B pi (I have been trying on an older 3B Pi -- don't want the old ones just to collect dust)


Will have a status video next wekend with more detail.